Download
Download is available until [expire_date]
- Version
- Download 2
- File Size 617.06 KB
- File Count 1
- Create Date September 21, 2022
- Last Updated September 21, 2022
Review of the Environmental Impact Assessment (EIA) Proposed Old Harbour Plant Repowering Project (190 MW)
Review of the Environmental Impact Assessment (EIA)
Proposed Old Harbour Plant Repowering Project (190 MW) done by CL Environmental Limited.
Review prepared by Jamaica Environment Trust with technical assistance from the Environmental Law Alliance Worldwide (December 2015).